{"id":2496,"date":"2023-08-02T14:44:30","date_gmt":"2023-08-02T22:44:30","guid":{"rendered":"https:\/\/staging.db-eco.us\/en\/?post_type=dbec_project&#038;p=2496"},"modified":"2025-10-08T09:16:40","modified_gmt":"2025-10-08T16:16:40","slug":"insourcing-rail-operations-and-maintenance","status":"publish","type":"dbec_project","link":"https:\/\/staging.db-eco.us\/en\/projects\/insourcing-rail-operations-and-maintenance\/","title":{"rendered":"Insourcing Rail Operations and Maintenance"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-header-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside gallery--static\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-header  glide__slide\" data-autoplay=\"false\"><div class=\"slide-header slide-header--banner-height\"><div><img loading=\"lazy\" decoding=\"async\" class=\"slide-header__image\" src=\"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg\" srcset=\"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-300x200.jpg 300w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-1024x683.jpg 1024w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-150x150.jpg 150w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-768x512.jpg 768w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-1536x1024.jpg 1536w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-2048x1365.jpg 2048w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-520x347.jpg 520w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-768x512.jpg 768w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-1280x853.jpg 1280w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-1920x1280.jpg 1920w\" alt=\"\" width=\"2560\" height=\"1707\"\/><div class=\"slide-header__cover\"><\/div><\/div><div class=\"label-reference-container\"><div class=\"label-reference label-reference--static\" data-image-reference=\"<p&gt;Volker Emersleben\/Deutsche Bahn AG<\/p&gt;\n\"><\/div><\/div><div class=\"slide-header__inner\"><div class=\"slide-header__center\"><div class=\"slide-header__container-headlines\"><h1 class=\"slide-header__headline\">Insourcing rail operations and maintenance<div class=\"slide-header__pulse-wrapper\"><div class=\"slide-header__pulse-line\"><\/div><\/div><\/h1><\/div><\/div><\/div><\/div><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n\n\n<nav class=\"breadcrumbs\" aria-label=\"breadcrumbs\"><ul class=\"breadcrumbs__inner\"><li><a class=\"breadcrumbs__home\" href=\"https:\/\/staging.db-eco.us\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a><svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><\/li><a data-is-distributor=\"true\" href=\"https:\/\/staging.db-eco.us\/en\/projects\/\">Projects<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><li><span class=\"breadcrumbs__actual-page\" aria-current=\"page\">Insourcing Rail Operations and Maintenance<\/span><\/li><\/ul><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE] - DB E.C.O. North America Inc.\" data-recipient=\"\" data-body=\"Here is an article by DB E.C.O. North America Inc. for you: [TITLE] - DB E.C.O. North America Inc. at [LINK]\"><span class=\"social-sharing__label\">Share on<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777.jpg\" srcset=\"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-300x200.jpg 300w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-1024x683.jpg 1024w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-150x150.jpg 150w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-768x512.jpg 768w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-1536x1024.jpg 1536w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-2048x1365.jpg 2048w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-520x347.jpg 520w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-768x512.jpg 768w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-1280x853.jpg 1280w, https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777-1920x1280.jpg 1920w\" alt=\"\" width=\"2480\" height=\"1653\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB234777.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Volker Emersleben\/Deutsche Bahn AG<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading\">Supporting a Rail O&amp;M Transition with Project Management and Subject Matter Expertise<\/h2>\n\n\n\n<p><strong><strong><strong>DB E.C.O. North America partnered with a leading transit organization to facilitate their in-house transition of rail operations and maintenance functions, aiming to achieve desired service quality, customer experience, and overall efficiency. The transition was supported by a combination of expert-led management consulting strategies and in-depth subject matter analysis in planning, risk assessments, training, documentation, and processes.<\/strong><\/strong><\/strong><a href=\"Challenge: Our client, a state rail transportation department, was experiencing sustained fleet availability and maintenance quality issues driven by unclear roles and responsibilities within their complex stakeholder landscape. The state-owned fleet is utilized by multiple agencies who manage service across several corridors and is maintained and operated by a 3rd party. Issues were resolved through frequent firefighting; however, no consistent fleet maintenance strategy was applied across the board. Approach: The DB team established a cross-functional task force to implement structural improvements and a KPI-based performance management process. Key measures were identified, calculated, and presented in clear and concise visuals. These scorecards were then translated to an analytics and visualization platform for further insight into performance. DB facilitated structured weekly performance dialogues between the fleet owner, service manger, and maintenance provider creating a venue for open discussion and for jointly troubleshooting inefficiencies and problems. Results: The project resulted in a gradual, measurable increase in fleet availability and decrease in maintenance dwell times. The ongoing weekly performance dialogues established an efficient and collaborative workflow between the various stakeholders and allowed for the resolution of systemic issues in fleet management.\"><\/a><\/p>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h4 class=\"wp-block-heading\">Challenge<\/h4>\n\n\n\n<p>Our client, a transit organization providing commuter rail and bus transportation, intended to improve service quality and customer experience while realizing operational efficiencies. Up to that point, the services were provided by external operations and maintenance (O&amp;M) contractors. Poor performance in service delivery resulted from role overlaps and the presence of rigid, poorly defined third-party processes. This, in turn, created challenges in communication and oversight, compelling the client to step in operationally and take responsibility for implementing improvements to achieve the expected level of performance and quality.<\/p>\n\n\n\n<p>Due to these challenges, our client eventually decided to insource O&amp;M and establish a direct relationship with the employees who perform critical operations and maintenance functions. Our team was asked to help plan and implement a smooth transition to in-house service delivery.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Approach<\/h4>\n\n\n\n<p>DB E.C.O. North America helped to plan and implement the transition by following a professional management consulting approach combined with state-of-the-art subject matter expertise from Deutsche Bahn\u2019s own vast experience with transitioning O&amp;M contracts.<\/p>\n\n\n\n<p>The team set up a solid transition project organization, developed a timeline and transition plan with clear roles and responsibilities, and implemented a risk management process. The main approach of the transition project was to create transition readiness across all involved functions (O&amp;M, Safety, Training, HR, IT, \u2026) in accordance with the set timeline. To identify the critical elements of the transition, the team developed an O&amp;M process map, audited relevant existing workflows, and reviewed and transferred existing operating procedures, manuals, and plans. Existing processes were compared to a best practice model for rail O&amp;M and it was decided which gaps to close during or post transition. Furthermore, the team performed an analysis of the existing organizational structure, helped with recommendations for future organizational changes, planned the recruitment of new staff, and supported the development of training materials and plans. Weekly steering committee meetings with executive leadership were supported using management reporting techniques and risks were collaboratively mitigated with the client to support project success.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Results<\/h4>\n\n\n\n<p>DB E.C.O. North America helped the organization to successfully manage the transition with a seamless shift from external to in-house O&amp;M, preserving operational stability from day one and onwards. Our strategic frameworks and post-transition audits helped the client to create O&amp;M milestones to establish a strong foundation, safeguarding against pitfalls and stabilizing operations. Training roadmaps were developed and implemented to support the effective integration of staff and facilitate the development of subject matter knowledge on the client side to optimize operational performance in the long term. Our organizational assessment built the foundation for future organizational changes enabling informed decision making on executive level, effective resource allocation, and overall organizational improvement post-transition. <\/p>\n\n\n\n<p>While immediate gains in efficiency and service quality were not the principal focus, the successful transition has strategically positioned the client to explore subsequent phases of improvement and optimization, thereby paving the way towards future advancements in service quality and operational excellence.<a href=\"Challenge: Our client, a state rail transportation department, was experiencing sustained fleet availability and maintenance quality issues driven by unclear roles and responsibilities within their complex stakeholder landscape. The state-owned fleet is utilized by multiple agencies who manage service across several corridors and is maintained and operated by a 3rd party. Issues were resolved through frequent firefighting; however, no consistent fleet maintenance strategy was applied across the board. Approach: The DB team established a cross-functional task force to implement structural improvements and a KPI-based performance management process. Key measures were identified, calculated, and presented in clear and concise visuals. These scorecards were then translated to an analytics and visualization platform for further insight into performance. DB facilitated structured weekly performance dialogues between the fleet owner, service manger, and maintenance provider creating a venue for open discussion and for jointly troubleshooting inefficiencies and problems. Results: The project resulted in a gradual, measurable increase in fleet availability and decrease in maintenance dwell times. The ongoing weekly performance dialogues established an efficient and collaborative workflow between the various stakeholders and allowed for the resolution of systemic issues in fleet management.\"><\/a><\/p>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"featured_media":0,"template":"","meta":{"post_allow-other-domains":""},"dbec_region":[],"dbec_issue":[],"dbec_product":[],"class_list":["post-2496","dbec_project","type-dbec_project","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Projects - Insourcing Rail Operations &amp; Maintenance<\/title>\n<meta name=\"description\" content=\"Discover our Insourcing Rail Operations &amp; Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/staging.db-eco.us\/en\/projects\/insourcing-rail-operations-and-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Projects - Insourcing Rail Operations &amp; Maintenance\" \/>\n<meta property=\"og:description\" content=\"Discover our Insourcing Rail Operations &amp; Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"DB E.C.O. North America Inc.\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T16:16:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/\",\"url\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/\",\"name\":\"Projects - Insourcing Rail Operations & Maintenance\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/staging.db-eco.us\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/DB229864-scaled.jpg\",\"datePublished\":\"2023-08-02T22:44:30+00:00\",\"dateModified\":\"2025-10-08T16:16:40+00:00\",\"description\":\"Discover our Insourcing Rail Operations & Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/staging.db-eco.us\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/DB229864-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/staging.db-eco.us\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/DB229864-scaled.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/projects\\\/insourcing-rail-operations-and-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/staging.db-eco.us\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Insourcing Rail Operations and Maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/staging.db-eco.us\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/staging.db-eco.us\\\/en\\\/\",\"name\":\"DB E.C.O. North America Inc.\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/staging.db-eco.us\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Projects - Insourcing Rail Operations & Maintenance","description":"Discover our Insourcing Rail Operations & Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/staging.db-eco.us\/en\/projects\/insourcing-rail-operations-and-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Projects - Insourcing Rail Operations & Maintenance","og_description":"Discover our Insourcing Rail Operations & Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.","og_url":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/","og_site_name":"DB E.C.O. North America Inc.","article_modified_time":"2025-10-08T16:16:40+00:00","og_image":[{"url":"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/","url":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/","name":"Projects - Insourcing Rail Operations & Maintenance","isPartOf":{"@id":"https:\/\/staging.db-eco.us\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg","datePublished":"2023-08-02T22:44:30+00:00","dateModified":"2025-10-08T16:16:40+00:00","description":"Discover our Insourcing Rail Operations & Maintenance project and learn how DB E.C.O optimizes rail services. More about our practices.","breadcrumb":{"@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/#primaryimage","url":"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg","contentUrl":"https:\/\/staging.db-eco.us\/wp-content\/uploads\/2023\/08\/DB229864-scaled.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/staging.db-eco.us\/projects\/insourcing-rail-operations-and-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/staging.db-eco.us\/en\/"},{"@type":"ListItem","position":2,"name":"Insourcing Rail Operations and Maintenance"}]},{"@type":"WebSite","@id":"https:\/\/staging.db-eco.us\/en\/#website","url":"https:\/\/staging.db-eco.us\/en\/","name":"DB E.C.O. North America Inc.","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/staging.db-eco.us\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"dbec_featured_media":null,"dbec_terms_region":[],"post_views":704,"_links":{"self":[{"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/dbec_project\/2496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/dbec_project"}],"about":[{"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/types\/dbec_project"}],"wp:attachment":[{"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/media?parent=2496"}],"wp:term":[{"taxonomy":"dbec_region","embeddable":true,"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/dbec_region?post=2496"},{"taxonomy":"dbec_issue","embeddable":true,"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/dbec_issue?post=2496"},{"taxonomy":"dbec_product","embeddable":true,"href":"https:\/\/staging.db-eco.us\/en\/wp-json\/wp\/v2\/dbec_product?post=2496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}